Topics

…while correction coils proceed at full speed

9 December 2003
cernnews7_12-03

The 1000th correction coil made in India for the LHC was handed over at a ceremony at the Department of Atomic Energy (DAE) in Mumbai at the end of September. The small celebration took place during the 9th meeting of the DAE-CERN Joint Committee that follows the progress of the Indian “in-kind” contributions to the LHC. The many items India is providing for the LHC construction include the very valuable and important contribution of superconducting correction windings – 1232 sextupole windings and 616 octupole/decapole windings. Production in India is now running at full speed and in fact exceeds the planned rates.

CERN Courier Jobs

Events

  • Accelerators | Conference LHCP 2025 5—9 May 2025 | Taipei City, Taiwan

  • Warning: Trying to access array offset on value of type null in /opt/app-root/src/wp-content/themes/iopp/modules/bright-recruits-item-events.php on line 36
    |
    Warning: Trying to access array offset on value of type bool in /opt/app-root/src/wp-content/themes/iopp/modules/bright-recruits-item-events.php on line 36

    Warning: Attempt to read property "name" on null in /opt/app-root/src/wp-content/themes/iopp/modules/bright-recruits-item-events.php on line 36
    Sustainable HEP 2025 12—15 May 2025 | Online
  • Accelerators | Conference IPAC25 1—6 June 2025 | Taipei City, Taiwan
bright-rec iop pub iop-science physcis connect