Topics

SLAC B-Factory makes progress

26 November 1998

news1_12-98

After achieving its first electron­positron collisions this summer, the PEP-II B-Factory at the Stanford Linear Accelerator Center (SLAC) was formally dedicated on 23 October.

 

news2_12-98

And major advances towards the operation of the BaBar detector are being made. Having installed the instrumented flux return and the superconducting solenoid early this year, the first step of the detector’s integration has been completed by adding the barrel crystal calorimeter and the central drift chamber. Finally, the particle identification system and the forward endcap calorimeter were installed this autumn.

news3_12-98

BaBar is now in a scheduled cosmic-ray run which will be concluded early next year with the addition of the silicon vertex tracker and when BaBar will roll into the B-Factory’s colliding electron and positron beams.

CERN Courier Jobs

Events

  • Accelerators | Conference LHCP 2025 5—9 May 2025 | Taipei City, Taiwan

  • Warning: Trying to access array offset on value of type null in /opt/app-root/src/wp-content/themes/iopp/modules/bright-recruits-item-events.php on line 36
    |
    Warning: Trying to access array offset on value of type bool in /opt/app-root/src/wp-content/themes/iopp/modules/bright-recruits-item-events.php on line 36

    Warning: Attempt to read property "name" on null in /opt/app-root/src/wp-content/themes/iopp/modules/bright-recruits-item-events.php on line 36
    Sustainable HEP 2025 12—15 May 2025 | Online
  • Accelerators | Conference IPAC25 1—6 June 2025 | Taipei City, Taiwan
bright-rec iop pub iop-science physcis connect