Topics

RHIC gold particles complete lap of ring

30 August 1999

On 16 July, a beam of gold nuclei circulated one of the two rings of Brookhaven’s Relativistic Heavy-Ion Collider (RHIC) for the first time.

Equipped with superconducting magnets, the machine operates at 4.6 K. After several “mini-ramp” cycles to test the beam-accelerating system in the first (blue) ring, the second (yellow) ring was powered in preparation for injection. The purpose of this commissioning phase is to accelerate beams in both rings for collisions. After commissioning, the RHIC research programme proper is scheduled to begin in November this year.

CERN Courier Jobs

Events


  • Warning: Trying to access array offset on value of type null in /opt/app-root/src/wp-content/themes/iopp/modules/bright-recruits-item-events.php on line 36
    |
    Warning: Trying to access array offset on value of type bool in /opt/app-root/src/wp-content/themes/iopp/modules/bright-recruits-item-events.php on line 36

    Warning: Attempt to read property "name" on null in /opt/app-root/src/wp-content/themes/iopp/modules/bright-recruits-item-events.php on line 36
    33rd Texas Symposium on Relativistic Astrophysics 8—12 December 2025 | Tempe
bright-rec iop pub iop-science physcis connect