Topics

Protons knock on the LHC’s door

8 July 2008
CCEnew1_07-08

On 24 May, a proton beam arrived on the threshold of the LHC, passing down transfer line TI 8 to the LHC, which runs from the SPS towards the LHC, where it intersects just before point 8. The TI 8 line became operational in October 2004. Now a beam has passed along it for only the second time, on this occasion in preparation for the full LHC start-up. The beam was extracted from the SPS, sent down the 2.8 km transfer line and stopped just 15 m or so from the LHC tunnel.

CERN Courier Jobs

Events

  • Accelerators | Conference LHCP 2025 5—9 May 2025 | Taipei City, Taiwan

  • Warning: Trying to access array offset on value of type null in /opt/app-root/src/wp-content/themes/iopp/modules/bright-recruits-item-events.php on line 36
    |
    Warning: Trying to access array offset on value of type bool in /opt/app-root/src/wp-content/themes/iopp/modules/bright-recruits-item-events.php on line 36

    Warning: Attempt to read property "name" on null in /opt/app-root/src/wp-content/themes/iopp/modules/bright-recruits-item-events.php on line 36
    Sustainable HEP 2025 12—15 May 2025 | Online
  • Accelerators | Conference IPAC25 1—6 June 2025 | Taipei City, Taiwan
bright-rec iop pub iop-science physcis connect