Topics

Data centre opens

19 July 2013
CCnew14_06_13

CERN and the Wigner Research Centre for Physics inaugurated the CERN Tier-0 data-centre extension in Budapest on 13 June, marking the completion of the facility. CERN’s director-general, Rolf Heuer, far left, joined József Pálinkás, president of the Hungarian Academy of Sciences, and Viktor Orbán, prime minister of Hungary, in the ceremonial “cutting the ribbon”, in the company of Péter József Lévai, far right, general director of the Wigner Research Centre for Physics (RCP). This extension adds up to 2.5 MW capacity to the 3.5 MW load of the data centre at CERN’s Meyrin site, which has already reached its limit. The dedicated and redundant 100 Gbit/s circuits connecting the two sites have been functional since February and about 20,000 computing cores, 500 servers and 5.5 PB of storage are already operational at the new facility.

CERN Courier Jobs

Events


  • Warning: Trying to access array offset on value of type null in /opt/app-root/src/wp-content/themes/iopp/modules/bright-recruits-item-events.php on line 36
    |
    Warning: Trying to access array offset on value of type bool in /opt/app-root/src/wp-content/themes/iopp/modules/bright-recruits-item-events.php on line 36

    Warning: Attempt to read property "name" on null in /opt/app-root/src/wp-content/themes/iopp/modules/bright-recruits-item-events.php on line 36
    33rd Texas Symposium on Relativistic Astrophysics 8—12 December 2025 | Tempe
bright-rec iop pub iop-science physcis connect