Topics

Knocking on the door again

15 July 2009

CCnew5_06_09

The LHC’s anti-clockwise beam transfer system was tested on 6 and 7 June. Particle bunches were sent from the SPS through the 2.8 km transfer line towards the LHC where it intersects just before the LHCb cavern. The beam went down the transfer line and stopped just before reaching the LHC tunnel, where a beam stopper – 4 m of graphite – is physically placed in the beam line to prevent the beam from taking the last step into the LHC. Part of the LHCb detector was turned on during the beam test, allowing the reconstruction of tracks through the Vertex Locator.

CERN Courier Jobs

Events


  • Warning: Trying to access array offset on value of type null in /opt/app-root/src/wp-content/themes/iopp/modules/bright-recruits-item-events.php on line 36
    |
    Warning: Trying to access array offset on value of type bool in /opt/app-root/src/wp-content/themes/iopp/modules/bright-recruits-item-events.php on line 36

    Warning: Attempt to read property "name" on null in /opt/app-root/src/wp-content/themes/iopp/modules/bright-recruits-item-events.php on line 36
    33rd Texas Symposium on Relativistic Astrophysics 8—12 December 2025 | Tempe
bright-rec iop pub iop-science physcis connect